آپادانا کاوش ایرانیان
Night/

Mining Three

In operation

Chadormalu Iron Ore Mine is located in the heart of central Iran's desert, on the northern slopes of the gray Chah-Mohammad mountains on the southern edge of the Saghand salt flat, 180 km northeast of Yazd and 300 km south of Tabas. Mining operations began in late 1989, with Asfalt Tous Company as the main contractor. Apadana Company joined as a mining contractor in late 2015 for drilling, extraction, and hauling of iron ore and overburden. The company's annual production averages 16.8 million tons of overburden and ore.

Type of material harvested

IRON

IRON

Sillicon

Sillicon

[02/2024]

Mine Name

Total Overburden Volume

100 million tons

Stripping Ratio

5 to 1

Proven Mineral Reserve

20 million tons at avg grade of 0.6% Cu and 0.3 g/t Au

Ultimate Pit Depth

350 meters

Overall Slope Angle

45 degrees

Bench Height

15 meters

Safety Berm Width

8 meters

Blasting Operations

Drilling Pattern

8×9 m (Burden × Spacing)

Powder Factor

0.35 kg/ton

Explosive Type

ANFO and Emulite for wet holes

Daily Blasting Capacity

150,000 tons

Production Capacity

Annual Overburden Removal

33 million tons (mine life ≈ 3 years main stripping phase)

Ore Extraction

6.5 million tons/year

Processing Plant Capacity

20,000 tons/day

Final Product

25% Cu concentrate and Doré gold bars

Infrastructure

Final Product

25% Cu concentrate and Doré gold bars

Processing Plant Capacity

20,000 tons/day

Ore Extraction

20,000 tons/day

Waste Dump

3 sites, total capacity 110 million tons

Mine Digram

Mining progress

Progress every month

+25%

Average progress in the last 4 months

[A/01]

Project Executive Managers

Team Member

Team Member

Project Manager

Partner since 2011

Team Member

Team Member

Project Manager

Partner since 2011

Team Member

Team Member

Project Manager

Partner since 2011

Team Member

Team Member

Project Manager

Partner since 2011

Team Member

Team Member

Project Manager

Partner since 2011

[c/03]

Certifications

ISO 9001 - Quality Management

2023

ISO 14001 - Environmental Management

2022

ISO 45001 - Occupational Health & Safety

2021

[c/03]

Project Documents

Documents

Construction of drinking water transmission line from Amir Kabir Dam to western cities of Tehran province, including pipeline installation and pumping station.

Rehabilitation and paving of 45 km rural road in Kouhpayeh district, Isfahan province, with sustainable development approach.

Auctions

Design and construction of mechanized pedestrian overpass at Hemmat Highway and Valiasr Street intersection in Tehran.

Supply and installation of smart street lighting equipment in District 3 of Mashhad municipality using solar LED technology.

Tenders

Infrastructure development, rural construction, and creation of sustainable local employment in areas adjacent to major mining projects in Iran.

Infrastructure development, rural construction, and creation of sustainable local employment in areas adjacent to major mining projects in Iran.